Pouring the footings began on schedule. Unfortunately, the concrete pump broke down after the first truckload. The bottom picture shows some of the cold joints that were created when concrete could no longer be pumped. The last picture in the series shows the second pump that arrived on site 3 hours later. Notice the tire on the pump. One of the tires on the pump blew 4 miles from the site and they rolled in on the rim.