Anchor bolts are added on 32 inch centers as the final finishing is done to the slab. Marks on the blocks indicate where rebar was added every 48 inches. The 6 inch PVC pipe extending from under the slab will pick up the gutter down spouts on the front half of the house to carry the water away from the foundation.