Subfloor Sheathing

The subfloor  sheathing is 3/4″ tongue and groove Norbord Pinnacle OSB, specifically engineered, and guaranteed against water damage for the first 100 days.  This is a crucial time during which the floor is exposed to the elements before the lodge is  enclosed.  The flooring is glued and nailed with rim shank nails.

Leave a comment