Framing of the Second Floor Begins November 18, 2016 by DickmanLegacyLodge First and last pictures reflect some of the quality framing details. Note the notches cut in the LVL’s for the 2 x 4’s. It is difficult to see the three bedrooms and two bathrooms on the second level because of the maze of framing in progress. Share this: Share on X (Opens in new window) X Share on Facebook (Opens in new window) Facebook Like Loading... Related