Perimeter block walls are installed. First picture shows the garage and the front porch. Third and fourth show the removal of the excess dirt within the walls and grading and compaction to prepare for pouring the crawl space slab.
Footings Complete
Concrete Pour Begins
Pouring the footings began on schedule. Unfortunately, the concrete pump broke down after the first truckload. The bottom picture shows some of the cold joints that were created when concrete could no longer be pumped. The last picture in the series shows the second pump that arrived on site 3 hours later. Notice the tire on the pump. One of the tires on the pump blew 4 miles from the site and they rolled in on the rim.
Destruction Over/Construction Begins
Official Job Site
No job site is official until you have a place to do the paperwork!
Tree Removal
A total of eight trees were cut down to make way for the new house. Several of which were in the neighbors yard, which they graciously agreed to.
Hi Ho, Hi Ho, off to work we go………
Out of Phase Demolition Video
Brick and concrete were salvaged for recycle by the highway department. Three tandem loads of dirt were brought in for the initial leveling after the demo.
When is the End the Beginning?

Demolition
Demolition
Great video of the beast consuming the house. Don’t miss this one.