Main Roof Rafters Complete

November 10, 2016 by DickmanLegacyLodge

The main roof rafters are placed on 24 inch centers.  The open areas in the roof will be filled with the gables for the two porches.  Those will be completed in the next few days.

20161109_153838
20161109_152347
20161109_153951
Leave a comment

Starting Roof Rafters

November 10, 2016 by DickmanLegacyLodge

Fifty one engineered TGI’s will be set for the main roof.  TGI’s provide stability and dimensional consistency that cannot be found in 2 x 12 rafters.  The result will be a smooth (not wavy) roof.

20161108_142734
20161108_153316
20161108_145041
Leave a comment

Finalizing Ridge Beam Installation/Sun Rise Omen

November 10, 2016 by DickmanLegacyLodge

428The awesome sun rise captured and posted on election day did prove to be the positive omen as predicted.  Proof positive (for my non-believing friends and family) that there really is a God.

20161108_082334
440
Leave a comment

Erecting the Main Ridge Beam

November 9, 2016 by DickmanLegacyLodge

The ridge beam is over 66 feet long and is erected in three sections.  The beam is a 5 inch LVL that is 18 inches deep.  The video shows the first of three sections being raised nearly 40 feet in the air.

20161108_082341

20161108_082341

Leave a comment

Preparation for the Ridge Beam

November 9, 2016 by DickmanLegacyLodge

Support structures are set in preparation for erecting the main ridge beam.  The second photo shows that the ridge beam will be nearly 20 feet above the second floor.

391
392
Leave a comment

Sun Rise@ Legacy Lodge on Election Day

November 9, 2016 by DickmanLegacyLodge

At the legacy lodge you don’t have to get up early to go fishing or hunting, but if you don’t get up for the sunrise you’ll be missing a lot.  Second and third pictures are out of the sun room window space.  Let’s hope the beautiful sunrise is a good omen for the election.

394
423
410
428
1 Comment

Building Inspectors Arrive

November 9, 2016 by DickmanLegacyLodge

Jeff, Kelly and the boys arrive to check out the progress.   Jeff and Tyler inspect the view from the second floor and find that they are now in the trees.   Blake inspects the fishing at the legacy lodge and shows they can be caught off the dock.  All by himself.

375
380
Leave a comment

Second Floor Decking Installed

November 9, 2016 by DickmanLegacyLodge

Tongue and groove decking is installed.  The big open area is the great room where a cathedral ceiling will be erected.  The small open area that can be seen in the upper right center of the 4th picture will have scissor trusses for the sun room.

384
385
388
433
Leave a comment

Second Floor Trusses Complete

November 9, 2016 by DickmanLegacyLodge

Eighteen inch high trusses on 16 inch centers along with massive beams support the second floor and weight of the roof structure.

372
373
Leave a comment

Second Floor Trusses are Set

November 9, 2016 by DickmanLegacyLodge

Engineered floor trusses arrive at the site.  Installation begins setting trusses on top of the first floor framing.

349
360
368
364
365
371
Leave a comment

Posts navigation

Older posts
Newer posts

Search

Blog at WordPress.com.
Dickman Legacy Lodge
Blog at WordPress.com.
  • Subscribe Subscribed
    • Dickman Legacy Lodge
    • Already have a WordPress.com account? Log in now.
    • Dickman Legacy Lodge
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...